Site Analysis Checklist for Architects: 40 Things to Check
Site Analysis

Site Analysis Checklist for Architects: 40 Things to Check

By Chavisha Arora9 min read

A site analysis checklist lists everything an architect should find out about a site before designing: context, built form, history, uses, access, climate, sun, ground, services and rules. This one has 40 checks, split into what you can do at your desk and what you can only see on site, with the source for each.

Use it before the first sketch, tick it on the site visit, and keep the answers with the project. Every check has a reason: if an answer would not change the design, skip it on that project.

Last checked: October 2026. Free to copy and print; no email needed.

How should you use a site analysis checklist?

  1. Desk study first. Do checks 1 to 28 from data before you visit. Print the maps.
  2. Site visit second. Do checks 29 to 40 on site, with the maps in hand.
  3. Write the answer, not a tick. "Prevailing wind from the south-west, 19% of hours" is useful later; a tick is not.
  4. End with design moves. Turn the answers into a short list of moves, as in the complete site analysis guide.

Desk study: what can you check before visiting?

Location and context

#CheckWhy it mattersWhere to find it
1Site boundary and areaEverything else is measured from itTitle plan, survey, or draw it on a map
2Neighbourhood characterSets the scale and language of the designFigure-ground, street photos
3Figure-ground within 250 to 500 mShows grain, density and open spaceFigure-ground map maker
4Building heights around the siteSets the height a scheme is judged againstBuilding height map, survey
5Street section across the siteShows enclosure and skySite section maker
6Landmarks and viewsViews to protect, frame or blockMaps, heritage register

History and heritage

#CheckWhy it mattersWhere to find it
7Building ages around the siteThe fabric you are adding toBuilding age map
8Listed buildings and protected areasCan stop or shape a schemeNational and city heritage registers
9Past uses of the siteContamination, foundations, archaeologyHistoric maps, archives
10Archaeology zonesCan add months to a programmeCity archaeology maps

Uses and access

#CheckWhy it mattersWhere to find it
11Land use around the siteWhat the area needs and toleratesLand use map
12Shops, schools, health within 400 to 800 mSets the programme and parking needAmenity map, OpenStreetMap
13Public transport stops and frequencyParking ratio, entrances, densityTransit map, operator timetables
14Street hierarchyWhere the main entrance and servicing goStreet hierarchy map
15Walking and cycling routesEntrances, bike storageAccessibility map
16Vehicle and service accessDeliveries, refuse, fire accessStreet plans, local rules
17Traffic noise sourcesRoom layout, glazing, ventilationNoise maps

Climate, sun and ground

#CheckWhy it mattersWhere to find it
18Temperature range and extremesHeating, cooling, shadingClimate archive, weather files
19Rainfall and wet daysRoofs, drainage, covered spaceClimate archive
20Prevailing wind by seasonEntrances, balconies, natural ventilationWind rose
21Sun path at solstices and equinoxOrientation, daylight, solar gainSun path diagram
22Overshadowing from neighboursDaylight to homes and gardensShadow study, shadow calculator
23Ground levels and slopeAccess, drainage, cut and fillContours, survey
24Flood risk and waterFloor levels, basements, insuranceFlood maps
25Trees and green coverProtected trees, shade, ecologyTree surveys, land cover data

Rules and services

#CheckWhy it mattersWhere to find it
26Zoning and allowed usesWhether the brief is possible at allLocal plan, zoning map
27Height, coverage, FAR and setbacksThe buildable envelopeLocal code, FAR calculator
28Utilities and easementsWhere you can and cannot buildUtility maps, title documents

Site visit: what can you only see on site?

#CheckWhat to note
29ArrivalHow you naturally arrive, and the first view of the site
30EdgesWhat each boundary is: wall, fence, building, open
31Party walls and neighbours' windowsRights of light, overlooking, structure
32Condition of existing buildingsKeep, adapt or demolish
33Noise at different timesMorning, school run, evening
34Smells and nuisancesKitchens, bins, workshops
35Light on siteWhere the sun actually falls, compared with the diagram
36Wind on siteCorners and gaps where it gusts
37How people use the streetWhere they wait, cross, sit, park bikes
38Views outWhat the best rooms should look at
39Ground and drainageWet patches, levels, kerbs
40Photos, pinned to the planOne per observation, located

What does a finished checklist look like?

On a real site, a Keizersgracht block in Amsterdam, three of the answers read:

  • #7 Building ages: 445 of 501 buildings within 250 m have a recorded date; the median is 1760; 87 are older than 1700.
  • #12 Shops and services: within 400 m, 98 cafés and restaurants, 3 supermarkets, 3 schools or nurseries, 4 pharmacies or doctors.
  • #20 Wind: from the south-west 19% of hours in 2025 and the south 19%; calm only 1.1% of hours.

Building ages within 250 m of a Keizersgracht block, Amsterdam. Data: OpenStreetMap (BAG register).

Each answer points to a decision: match the old roofline, skip the car park, shelter the south-west corner. That is the difference between a checklist and a site analysis.

What should you add to the checklist on an Indian site?

The 40 checks hold everywhere, but some answers carry far more weight in India. Add these to the desk study:

CheckWhy it matters in IndiaWhere to find it
Protected monuments within 300 mUnder the AMASR Act, nothing new can be built within 100 m of a centrally protected monument, and the next 200 m needs National Monuments Authority permissionASI circle lists, NMA, state archaeology department
Master plan and local building rulesCoverage, FAR, height and setbacks come from the master plan and bye-laws, such as Delhi's MPD and Unified Building Bye-Laws or Mumbai's DCPR 2034Development authority and municipal websites
Plot size category and road widthRules change by plot-size band, and in many cities FAR rises with the width of the road the plot facesThe same rules, plus a measured road width
Stilt parking and heightStilt parking is often excluded from FAR but counts in height, which decides how many floors fitBye-laws
Fire and airport height limitsFire service clearance and an Airports Authority of India height NOC can cap heightFire service rules, AAI's online NOC maps
Mandatory green measuresRainwater harvesting, solar and waste segregation are required on many plot sizesBye-laws
Monsoon flooding and waterloggingMost of the year's rain falls in a few monthsMunicipal drainage maps, local knowledge, the site visit
Building heightsOpen data rarely records storeys, so heights come from the site visitSite visit, photos

On the Green Park block in New Delhi, three answers read:

  • Heritage: Bara Khamba, Chhoti Gumti and Sakri Gumti, all centrally protected, stand about 190 m, 230 m and 280 m away, so the block is in their regulated area and needs NMA permission.
  • Rules: a 300 m² plot falls in the band of more than 250 and up to 500 m²: 75% coverage, FAR 225, 15 m high or 17.5 m with stilt parking (MPD-2021 norms; MPD-2047 was notified on 20 August 2026, so check its regulations).
  • Climate: 30 days at 40 °C or more in 2025 and 85% of the rain from June to September.

Protected monuments near a Green Park block in New Delhi, with 100 m and 300 m rings.

The full Delhi analysis is in the complete site analysis guide.

How can you fill in the desk study faster?

Checks 1 to 28 are mostly data. Pulling them by hand takes a day or more per site. UrbanEyes Site Analysis fills most of them for any address in about fifteen minutes, each with its source: context maps, building heights and ages where recorded, land use, amenities, transit, climate, sun and wind, and a feasibility screen for supported countries. You can keep the checklist on a site analysis board beside the maps.

Frequently Asked Questions

What should be included in a site analysis checklist?

Location and context, built form and heights, history and heritage, uses and amenities, access and transport, climate, sun and shadow, ground and water, trees, planning rules and utilities, plus site-visit checks such as edges, noise, light and views.

What is the difference between a desk study and a site visit?

The desk study collects what data and documents can tell you before visiting. The site visit checks what data cannot show: condition, noise, use, light on the ground and views.

How many items should a site analysis checklist have?

Thirty to fifty is typical. This one has 40: 28 for the desk study and 12 for the site visit. Drop items that would not change the design on your project.

Is there a free site analysis checklist?

Yes, this one is free to copy and print with no email. The tools linked in it, such as the figure-ground map maker, sun path diagram and FAR calculator, are free too.

What extra checks does a site analysis in India need?

Protected monuments within 300 m, the master plan and building bye-laws, the plot size band and road width, stilt parking and height limits, fire and airport height clearances, mandatory rainwater harvesting and solar, and monsoon flooding.

Can site analysis be automated?

The desk study largely can: maps, figures, climate and sun come from open data. The site visit, the judgement and the design moves cannot.

Chavisha Arora

Chavisha Arora

Co-founder, UrbanEyes